Triple

T33351223
Position Surface form Disambiguated ID Type / Status
Subject Tlatelolco–La Raza–Deportivo 18 de Marzo section E853945 entity
Predicate instanceOf P0 FINISHED
Object transport infrastructure segment C61166 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transport infrastructure segment
Context triple: [Tlatelolco–La Raza–Deportivo 18 de Marzo section, instanceOf, transport infrastructure segment]
  • A. transport infrastructure network
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • B. transport sector
    The transport sector encompasses all systems, services, and infrastructure involved in moving people and goods by road, rail, air, and water.
  • C. rail transportation infrastructure
    Rail transportation infrastructure encompasses the physical and organizational systems—such as tracks, stations, signaling, power supply, and related facilities—required to support the safe and efficient movement of trains and rail-based services.
  • D. transport corridor segment chosen
    A transport corridor segment is a defined linear portion of a transportation route (such as a road, rail line, or shipping lane) characterized by consistent physical, operational, and regulatory attributes used for planning, management, and analysis.
  • E. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3496acbc8819099fd0305ecc42080 completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:34 a.m.