Triple

T33320086
Position Surface form Disambiguated ID Type / Status
Subject United BusinessFirst E853112 entity
Predicate approximatePhaseOutStartYear P162723 FINISHED
Object 2016 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2016 | Statement: [United BusinessFirst, approximatePhaseOutStartYear, 2016]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: approximatePhaseOutStartYear
Context triple: [United BusinessFirst, approximatePhaseOutStartYear, 2016]
  • A. finalPhaseOutBeganYear
    Indicates the calendar year in which the process of completely discontinuing or eliminating something officially began.
  • B. plannedShutdownYear
    Indicates the year in which an entity is scheduled or planned to be shut down or taken out of operation.
  • C. hasDiscontinuationApproxYear
    Indicates that an entity ceased to exist, operate, or be available around a specified (approximate) calendar year.
  • D. decommissioningStartDate
    Indicates the date on which the process of taking an asset or system out of active service is initiated.
  • E. graduallyPhasedOutIn chosen
    Indicates that something is discontinued or removed in a particular context or period through a slow, step-by-step process rather than all at once.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349685f088190b8fda44083a018a9 completed April 30, 2026, 12:22 p.m.
NER Named-entity recognition batch_69fed83b1d188190a318b0ad3003200a completed May 9, 2026, 6:46 a.m.
PD Predicate disambiguation batch_69fed78e03548190b6e6ad93ae8d131d completed May 9, 2026, 6:43 a.m.
Created at: May 1, 2026, 1:33 a.m.