Triple
T33313260
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Via Carpatia |
E852943
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | international road corridor |
C2952
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: international road corridor Context triple: [Via Carpatia, instanceOf, international road corridor]
-
A.
international road
An international road is a major transportation route that connects multiple countries, facilitating cross-border travel and trade by linking national road networks.
-
B.
road transportation corridor
A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
-
C.
transport corridor
chosen
A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
-
D.
international air route
An international air route is a designated flight path that connects airports in different countries, governed by bilateral or multilateral agreements and aviation regulations.
-
E.
transcontinental automobile route
A transcontinental automobile route is a long-distance roadway or network of connected highways that enables continuous vehicular travel across an entire continent from one coast or border to another.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349679fd8819093b9b40e989440e3 |
completed | April 30, 2026, 12:21 p.m. |
Created at: May 1, 2026, 1:33 a.m.