Triple

T33277494
Position Surface form Disambiguated ID Type / Status
Subject Balcerowicz Plan E851944 entity
Predicate instanceOf P0 FINISHED
Object shock therapy reform C60559 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: shock therapy reform
Context triple: [Balcerowicz Plan, instanceOf, shock therapy reform]
  • A. New Economic Mechanism
    The New Economic Mechanism was a set of economic reforms introduced in socialist countries (notably Hungary in 1968) that sought to decentralize planning, increase enterprise autonomy, and incorporate market-like incentives within a planned economy.
  • B. Staatsreform
    Staatsreform bezeichnet die umfassende, geplante Veränderung staatlicher Strukturen, Institutionen und Entscheidungsprozesse, um deren Funktionsfähigkeit, Effizienz, Legitimation oder demokratische Qualität an neue gesellschaftliche, wirtschaftliche oder politische Rahmenbedingungen anzupassen.
  • C. reformist
    A reformist is an individual who seeks to improve or change existing systems, institutions, or practices through gradual, lawful, and often incremental reforms rather than radical or revolutionary means.
  • D. Soviet economic policy
    Soviet economic policy refers to the centrally planned, state-controlled system that directed production, distribution, and investment according to government-determined goals rather than market forces, aiming to rapidly industrialize and achieve socialist objectives.
  • E. centralization reform
    Centralization reform is a process of restructuring governance or organizational systems to concentrate decision-making authority, resources, and control within a central body or leadership.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349653da08190819876015a298fdb completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:32 a.m.