Triple

T33239992
Position Surface form Disambiguated ID Type / Status
Subject Park Road Post Production E850936 entity
Predicate instanceOf P0 FINISHED
Object film post-production facility C20704 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: film post-production facility
Context triple: [Park Road Post Production, instanceOf, film post-production facility]
  • A. film post-production company
    A film post-production company is a business that specializes in editing, visual effects, sound design, color grading, and final mastering to complete and polish film and video projects after principal photography.
  • B. film studio
    A film studio is a company or facility that finances, produces, and often distributes motion pictures and related media content.
  • C. post-production company chosen
    A post-production company is a specialized business that handles the editing, visual effects, sound design, color grading, and final assembly of film, television, and other media projects after principal photography is completed.
  • D. production studio
    A production studio is a facility equipped with the space, technology, and personnel needed to plan, create, and finalize audio, video, or multimedia content.
  • E. film production system
    A film production system is an integrated framework of processes, tools, and roles that collaboratively plan, create, manage, and deliver motion picture content from initial concept through final distribution.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34962386c81909ddc3bf9e18ddeb8 completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:31 a.m.