Triple
T33206246
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Danazol |
E850019
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | synthetic androgen |
C59183
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: synthetic androgen Context triple: [Danazol, instanceOf, synthetic androgen]
-
A.
synthetic auxin
A synthetic auxin is a man-made compound that mimics the action of natural plant auxin hormones to regulate growth and development, often used as a herbicide or growth regulator.
-
B.
hormone
A hormone is a chemical messenger produced by glands in the body that travels through the bloodstream to regulate the activity and function of specific cells and organs.
-
C.
GIP receptor agonist
A GIP receptor agonist is a compound that binds to and activates the glucose-dependent insulinotropic polypeptide (GIP) receptor, enhancing insulin secretion and improving glucose regulation.
-
D.
synthetic material
A synthetic material is a man-made substance engineered through chemical processes to exhibit specific physical, chemical, or functional properties not typically found in natural materials.
-
E.
IGF-1R inhibitor
An IGF-1R inhibitor is a drug that blocks the insulin-like growth factor 1 receptor to reduce signaling pathways that promote cell growth, survival, and proliferation, particularly in cancer cells.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3495fb92c819083ce65d0ddee7a76 |
completed | April 30, 2026, 12:21 p.m. |
Created at: May 1, 2026, 1:30 a.m.