Triple

T3319975
Position Surface form Disambiguated ID Type / Status
Subject Carroll Creek Linear Park E69770 entity
Predicate partOf P40 FINISHED
Object Carroll Creek flood control project
Carroll Creek flood control project is an urban water management and revitalization initiative in Frederick, Maryland, designed to prevent flooding while supporting public spaces, trails, and downtown redevelopment along Carroll Creek.
E348848 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Carroll Creek flood control project | Statement: [Carroll Creek Linear Park, partOf, Carroll Creek flood control project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Carroll Creek flood control project
Context triple: [Carroll Creek Linear Park, partOf, Carroll Creek flood control project]
  • A. Green Brook Flood Control Project
    The Green Brook Flood Control Project is a comprehensive flood mitigation initiative designed to protect Bound Brook and surrounding New Jersey communities from recurring flooding through levees, floodwalls, channel improvements, and related infrastructure.
  • B. Nolin River Lake project
    The Nolin River Lake project is a U.S. Army Corps of Engineers flood-control and recreation initiative centered on Nolin River Lake in central Kentucky.
  • C. Don River and Central Waterfront Project
    The Don River and Central Waterfront Project is a major urban revitalization and flood-protection initiative in Toronto focused on transforming the lower Don River and adjacent waterfront into a more resilient, accessible, and ecologically restored landscape.
  • D. Klamath Project
    The Klamath Project is a major federal water management and irrigation system in southern Oregon and northern California that supplies water to agriculture, wildlife refuges, and communities in the Klamath Basin.
  • E. Fountain Creek Watershed Flood Control and Greenway District
    The Fountain Creek Watershed Flood Control and Greenway District is a regional governmental entity in Colorado responsible for managing flood control, watershed protection, and greenway development along Fountain Creek and its surrounding basin.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Carroll Creek flood control project
Triple: [Carroll Creek Linear Park, partOf, Carroll Creek flood control project]
Generated description
Carroll Creek flood control project is an urban water management and revitalization initiative in Frederick, Maryland, designed to prevent flooding while supporting public spaces, trails, and downtown redevelopment along Carroll Creek.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Carroll Creek flood control project
Target entity description: Carroll Creek flood control project is an urban water management and revitalization initiative in Frederick, Maryland, designed to prevent flooding while supporting public spaces, trails, and downtown redevelopment along Carroll Creek.
  • A. Green Brook Flood Control Project
    The Green Brook Flood Control Project is a comprehensive flood mitigation initiative designed to protect Bound Brook and surrounding New Jersey communities from recurring flooding through levees, floodwalls, channel improvements, and related infrastructure.
  • B. Nolin River Lake project
    The Nolin River Lake project is a U.S. Army Corps of Engineers flood-control and recreation initiative centered on Nolin River Lake in central Kentucky.
  • C. Don River and Central Waterfront Project
    The Don River and Central Waterfront Project is a major urban revitalization and flood-protection initiative in Toronto focused on transforming the lower Don River and adjacent waterfront into a more resilient, accessible, and ecologically restored landscape.
  • D. Klamath Project
    The Klamath Project is a major federal water management and irrigation system in southern Oregon and northern California that supplies water to agriculture, wildlife refuges, and communities in the Klamath Basin.
  • E. Fountain Creek Watershed Flood Control and Greenway District
    The Fountain Creek Watershed Flood Control and Greenway District is a regional governmental entity in Colorado responsible for managing flood control, watershed protection, and greenway development along Fountain Creek and its surrounding basin.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85a0bb048190a5458d2738012d61 completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adb13a4e948190841134d6ae6ef432 completed March 8, 2026, 5:26 p.m.
NED1 Entity disambiguation (via context triple) batch_69b31a776f3881908e8b198f31921453 completed March 12, 2026, 7:56 p.m.
NEDg Description generation batch_69b31c34cc388190a5fab8e9b2a1aa92 completed March 12, 2026, 8:04 p.m.
NED2 Entity disambiguation (via description) batch_69b31da025048190b7d1611df82a542c completed March 12, 2026, 8:10 p.m.
Created at: March 8, 2026, 3:11 p.m.