Triple

T3317129
Position Surface form Disambiguated ID Type / Status
Subject Vanguard-class ballistic missile submarine E69707 entity
Predicate plannedSuccessorClass P10131 FINISHED
Object Dreadnought-class ballistic missile submarine E234046 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Dreadnought-class ballistic missile submarine | Statement: [Vanguard-class ballistic missile submarine, plannedSuccessorClass, Dreadnought-class ballistic missile submarine]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Dreadnought-class ballistic missile submarine
Context triple: [Vanguard-class ballistic missile submarine, plannedSuccessorClass, Dreadnought-class ballistic missile submarine]
  • A. Vanguard-class ballistic missile submarines
    Vanguard-class ballistic missile submarines are the United Kingdom’s nuclear-powered, nuclear-armed submarines that form the seaborne leg of its strategic deterrent force.
  • B. Triomphant-class ballistic missile submarines
    The Triomphant-class ballistic missile submarines are France’s current generation of nuclear-powered strategic deterrent submarines, designed to carry and launch submarine-launched ballistic missiles as part of the French nuclear arsenal.
  • C. Vanguard-class submarine
    The Vanguard-class submarine is a class of British nuclear-powered ballistic missile submarines that form the seaborne leg of the United Kingdom’s strategic nuclear deterrent.
  • D. Dreadnought-class nuclear-powered ballistic missile submarines chosen
    The Dreadnought-class nuclear-powered ballistic missile submarines are the United Kingdom’s next-generation Trident-armed deterrent vessels designed to replace the Vanguard class and maintain the country’s continuous at-sea nuclear deterrence.
  • E. Delta-class submarine
    The Delta-class submarine is a series of Soviet nuclear-powered ballistic missile submarines developed during the Cold War to enhance the USSR’s strategic nuclear deterrent.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedSuccessorClass
Context triple: [Vanguard-class ballistic missile submarine, plannedSuccessorClass, Dreadnought-class ballistic missile submarine]
  • A. successorClass chosen
    Indicates that one class directly follows or replaces another class in a sequence or hierarchy.
  • B. successorDeterminedBy
    Indicates that the identity of a successor is established or chosen according to a specified rule, process, or determining factor.
  • C. successorModel
    Indicates that one model is the direct follow-up or replacement for another earlier model.
  • D. successorInterface
    Indicates that one interface directly follows and replaces another interface in a sequence or version lineage.
  • E. predecessorClass
    Indicates that one class precedes another in an ordered sequence or hierarchy, typically representing an earlier version or prior stage of that class.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85a0bb048190a5458d2738012d61 completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adb11230b881908f5b554323729cc5 completed March 8, 2026, 5:25 p.m.
NED1 Entity disambiguation (via context triple) batch_69b3609bd0d48190838df7dd7cbca159 completed March 13, 2026, 12:55 a.m.
PD Predicate disambiguation batch_69ada4282730819092aa39c5f9269df0 completed March 8, 2026, 4:30 p.m.
Created at: March 8, 2026, 3:11 p.m.