Triple

T33118449
Position Surface form Disambiguated ID Type / Status
Subject Dorian E847522 entity
Predicate productionStatusInStory P196295 FINISHED
Object Discontinued model LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Discontinued model | Statement: [Dorian, productionStatusInStory, Discontinued model]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: productionStatusInStory
Context triple: [Dorian, productionStatusInStory, Discontinued model]
  • A. storyStatus
    Indicates the current state or phase of a story within its lifecycle (e.g., planned, in progress, completed, or archived).
  • B. narrativeStatus
    Indicates the role or state of an element within a narrative, such as whether it is current, hypothetical, background, or otherwise positioned in the story’s progression.
  • C. storyCanonStatus
    Indicates the canonical status of a story relative to an official or primary continuity.
  • D. teamStatusInStory
    Indicates the status or role a team holds within the context of a particular story or narrative.
  • E. screenplayStatus
    Indicates the current state or phase of a screenplay within its creation, revision, or production process.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3495751a081909850af5843da40dc completed April 30, 2026, 12:21 p.m.
NER Named-entity recognition batch_69fe1fd637c08190aa95cd2478c278cb completed May 8, 2026, 5:39 p.m.
PD Predicate disambiguation batch_69fe19344bb481909b5e2144155e4add completed May 8, 2026, 5:11 p.m.
PDg Predicate description generation batch_69fe1fd58ad8819093d3d705e8521014 completed May 8, 2026, 5:39 p.m.
Created at: May 1, 2026, 1:27 a.m.