Triple

T3309862
Position Surface form Disambiguated ID Type / Status
Subject Castaic Dam E69543 entity
Predicate partOf P40 FINISHED
Object State Water Project power system E10289 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: State Water Project power system | Statement: [Castaic Dam, partOf, State Water Project power system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: State Water Project power system
Context triple: [Castaic Dam, partOf, State Water Project power system]
  • A. State Water Project chosen
    The State Water Project is a massive California water storage and delivery system that transports water from northern sources to agricultural, urban, and industrial users across the state, including the Central Valley.
  • B. Colorado River Storage and Regulation System
    The Colorado River Storage and Regulation System is a network of dams, reservoirs, and related infrastructure designed to manage, store, and control the flow of the Colorado River for water supply, flood control, and hydroelectric power generation.
  • C. Central Valley Project
    The Central Valley Project is a large-scale federal water management system in California that stores and delivers water for agriculture, cities, and environmental uses across the Central Valley.
  • D. Columbia Basin Project
    The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
  • E. Columbia River hydropower system
    The Columbia River hydropower system is an extensive network of dams and generating facilities that provides a major share of the Pacific Northwest’s electricity while also supporting irrigation, navigation, and flood control.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad859f218081909458d2cebbf57565 completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adb0eb6dd08190bab1ce80f417966a completed March 8, 2026, 5:24 p.m.
NED1 Entity disambiguation (via context triple) batch_69b2f3f0d52081908bbade5e514f17d1 completed March 12, 2026, 5:12 p.m.
Created at: March 8, 2026, 3:11 p.m.