Triple

T33089283
Position Surface form Disambiguated ID Type / Status
Subject Gibson Ek High School E846725 entity
Predicate instanceOf P0 FINISHED
Object project-based learning school C61707 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: project-based learning school
Context triple: [Gibson Ek High School, instanceOf, project-based learning school]
  • A. educational project
    An educational project is a structured learning initiative designed to achieve specific educational objectives through planned activities, resources, and assessments.
  • B. public school
    A public school is a government-funded educational institution that provides free, standardized instruction to students within a designated community or district.
  • C. school building program
    A school building program is an organized initiative to plan, fund, construct, renovate, and maintain educational facilities to meet current and future learning needs.
  • D. laboratory school
    A laboratory school is an educational institution, often affiliated with a university, that serves as a site for teacher training, educational research, and the development and testing of innovative teaching methods and curricula.
  • E. project-based mechanism
    A project-based mechanism is a structured approach or system in which resources, incentives, and decision-making processes are organized around discrete projects to achieve specific goals or outcomes.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3495590dc8190aa04f3dec74ce976 completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:26 a.m.