Triple
T33086184
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Harbor Drive freeway |
E846647
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | demolished highway |
C36191
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: demolished highway Context triple: [Harbor Drive freeway, instanceOf, demolished highway]
-
A.
motorway cutting
A motorway cutting is a man-made excavation through higher ground that creates a lowered passage for a motorway, typically with exposed earth or rock faces on either side.
-
B.
highway
A highway is a major public road designed for high-speed, long-distance vehicular travel, typically featuring multiple lanes, limited access points, and safety infrastructure.
-
C.
former road bypass
chosen
A former road bypass is a roadway that was originally constructed to divert through-traffic around a town or congested area but has since been decommissioned, reclassified, or repurposed so it no longer functions as the primary bypass route.
-
D.
elevated expressway
An elevated expressway is a high-capacity roadway built on raised structures above ground level to allow uninterrupted traffic flow over urban streets, railways, or other obstacles.
-
E.
road infrastructure
Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34954d46c8190a04a159cc5f99efd |
completed | April 30, 2026, 12:21 p.m. |
Created at: May 1, 2026, 1:26 a.m.