Triple
T33078297
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Paks Nuclear Power Plant |
E846430
|
entity |
| Predicate | electricalCapacityPerUnit |
P54646
|
FINISHED |
| Object | approximately 500 MWe |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: approximately 500 MWe | Statement: [Paks Nuclear Power Plant, electricalCapacityPerUnit, approximately 500 MWe]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: electricalCapacityPerUnit Context triple: [Paks Nuclear Power Plant, electricalCapacityPerUnit, approximately 500 MWe]
-
A.
netElectricalCapacity_MWe
Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
-
B.
totalElectricalCapacity_MWe
Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
-
C.
electricalPower
Indicates that one entity supplies, carries, or is associated with electrical power to or for another entity.
-
D.
designedCapacityMW
Indicates the maximum electrical power output, in megawatts, that something is originally designed or rated to produce or handle.
-
E.
grossElectricalCapacity_MWe
chosen
Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34954d46c8190a04a159cc5f99efd |
completed | April 30, 2026, 12:21 p.m. |
| NER | Named-entity recognition | batch_69fec4cffed08190b5e5e7cc0c87493e |
completed | May 9, 2026, 5:23 a.m. |
| PD | Predicate disambiguation | batch_69fec2ea7fe08190bd751b39515f69d1 |
completed | May 9, 2026, 5:15 a.m. |
Created at: May 1, 2026, 1:25 a.m.