Triple

T32992155
Position Surface form Disambiguated ID Type / Status
Subject Hanoi public bus network E844114 entity
Predicate instanceOf P0 FINISHED
Object bus rapid transit-free bus network C31035 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bus rapid transit-free bus network
Context triple: [Hanoi public bus network, instanceOf, bus rapid transit-free bus network]
  • A. bus rapid transit facility
    A bus rapid transit facility is a dedicated infrastructure element—such as stations, lanes, and terminals—designed to support high-capacity, fast, and reliable bus-based public transportation.
  • B. bus rapid transit line
    A bus rapid transit line is a high-capacity bus corridor that uses dedicated lanes, priority signaling, and streamlined stations to provide fast, reliable, rail-like transit service.
  • C. bus rapid transit standard
    A bus rapid transit standard is a set of criteria and guidelines used to design, evaluate, and certify high-quality bus-based transit systems that provide fast, reliable, and efficient service similar to rail.
  • D. bus service network chosen
    A bus service network is an interconnected system of bus routes, stops, schedules, and vehicles designed to transport passengers efficiently across a defined geographic area.
  • E. rapid transit network
    A rapid transit network is an integrated system of high-capacity, high-frequency urban rail or bus lines designed to move large numbers of passengers quickly and efficiently across a metropolitan area.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3494d99988190b502c68926af2c4d completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:22 a.m.