Triple

T32987908
Position Surface form Disambiguated ID Type / Status
Subject Semiconductor Systems E843997 entity
Predicate supportsProcessStep GENERATED
Object deposition UNRECOGNIZED GENERATED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: supportsProcessStep
Context triple: [Semiconductor Systems, supportsProcessStep, deposition]
  • A. supportsProcesses
    Indicates that one entity provides the necessary functionality, resources, or environment for certain processes of another entity to operate or be carried out.
  • B. supportsWorkflowStage chosen
    Indicates that one entity enables, is compatible with, or is configured to operate at a particular stage within a defined workflow.
  • C. isProcessedBy
    Indicates that an entity undergoes some form of handling, transformation, or treatment performed by another entity or agent.
  • D. supportsExceptionProcessing
    Indicates that one entity provides the capability or mechanism for another entity to handle or process exceptions.
  • E. supportsFeature
    Indicates that one entity provides, enables, or is compatible with a particular feature or capability of another.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3494c6f9c8190a255409fce8b1d3b completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:22 a.m.