Triple

T32968773
Position Surface form Disambiguated ID Type / Status
Subject Pennsylvania Railroad Schuylkill Branch E843450 entity
Predicate instanceOf P0 FINISHED
Object former Pennsylvania Railroad line C1439 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: former Pennsylvania Railroad line
Context triple: [Pennsylvania Railroad Schuylkill Branch, instanceOf, former Pennsylvania Railroad line]
  • A. former transit line
    A former transit line is a previously operational public transportation route, such as a bus, tram, or rail line, that has been permanently discontinued or replaced.
  • B. railroad line chosen
    A railroad line is a fixed route consisting of tracks and associated infrastructure over which trains operate to transport passengers or freight between locations.
  • C. Amtrak Thruway Motorcoach route
    An Amtrak Thruway Motorcoach route is a scheduled bus service that connects passengers to and from Amtrak train stations, extending rail network coverage to areas not directly served by trains.
  • D. Maine Central Railroad line
    A Maine Central Railroad line is a specific railway route or segment operated by the Maine Central Railroad, used for transporting passengers and freight across designated regions in New England.
  • E. SEPTA Norristown High Speed Line station
    A SEPTA Norristown High Speed Line station is a passenger transit stop along the Norristown High Speed Line that provides platforms, access facilities, and services for boarding and alighting high-speed light rail vehicles.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3494b9fc48190bb61c955ba471275 completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:21 a.m.