Triple

T3296712
Position Surface form Disambiguated ID Type / Status
Subject Zambezi Basin E69232 entity
Predicate hasHydropowerDam P15311 FINISHED
Object Kariba Dam E343315 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kariba Dam | Statement: [Zambezi Basin, hasHydropowerDam, Kariba Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kariba Dam
Context triple: [Zambezi Basin, hasHydropowerDam, Kariba Dam]
  • A. Kariba Dam chosen
    Kariba Dam is a massive hydroelectric dam on the Zambezi River between Zambia and Zimbabwe, forming one of the world’s largest man-made lakes and serving as a key source of power for the region.
  • B. Batoka Gorge
    Batoka Gorge is a steep, rugged chasm carved by the Zambezi River just downstream of Victoria Falls on the border between Zambia and Zimbabwe.
  • C. Roseires Dam
    Roseires Dam is a major hydroelectric and irrigation dam on the Blue Nile in Sudan, crucial for water storage, power generation, and flood control in the region.
  • D. Cahora Bassa Dam
    Cahora Bassa Dam is a major hydroelectric dam in Mozambique that forms one of Africa’s largest artificial lakes and supplies significant power to the region.
  • E. Kinzua Dam
    Kinzua Dam is a large U.S. Army Corps of Engineers flood-control and hydroelectric dam in northwestern Pennsylvania that created the Allegheny Reservoir.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad859e529c8190a404273f53cb487d completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adb078f3dc8190afb624f62894e48f completed March 8, 2026, 5:23 p.m.
NED1 Entity disambiguation (via context triple) batch_69b35458a1248190b11e6756dfc318b7 completed March 13, 2026, 12:03 a.m.
Created at: March 8, 2026, 3:10 p.m.