Triple
T32959956
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Horns Rev offshore wind projects |
E843207
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | offshore wind farm complex |
C9379
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: offshore wind farm complex Context triple: [Horns Rev offshore wind projects, instanceOf, offshore wind farm complex]
-
A.
wind power facility
A wind power facility is an installation that converts the kinetic energy of wind into electrical energy using one or more wind turbines, along with associated infrastructure for control, transmission, and maintenance.
-
B.
wind power plant
chosen
A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
-
C.
offshore wind licensing round
An offshore wind licensing round is a formal, competitive process through which a governing authority offers defined seabed areas or rights for the exploration, development, and operation of offshore wind energy projects.
-
D.
hydro-wind power plant
A hydro-wind power plant is a hybrid energy facility that combines hydropower and wind turbines to generate electricity more reliably and efficiently by leveraging complementary water and wind resources.
-
E.
offshore petroleum export facility
An offshore petroleum export facility is a marine-based installation that receives, stores, and transfers produced oil or gas from offshore fields to tankers or pipelines for transport to onshore markets.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3494af2808190ad98cec2f1bc0fe6 |
completed | April 30, 2026, 12:21 p.m. |
Created at: May 1, 2026, 1:21 a.m.