Triple

T32959797
Position Surface form Disambiguated ID Type / Status
Subject Advanced Gas-cooled Reactor E843202 entity
Predicate backupShutdownSystem P175050 FINISHED
Object nitrogen injection into coolant LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: nitrogen injection into coolant | Statement: [Advanced Gas-cooled Reactor, backupShutdownSystem, nitrogen injection into coolant]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: backupShutdownSystem
Context triple: [Advanced Gas-cooled Reactor, backupShutdownSystem, nitrogen injection into coolant]
  • A. shutdownCapability
    Indicates the ability or permission for one entity to power off, deactivate, or terminate the operation of another entity or system.
  • B. shutdownMethod chosen
    Indicates the manner or procedure by which a system, device, or process is turned off or brought to a stop.
  • C. permanentShutdown
    Indicates that an entity has been irreversibly taken out of operation and will not be restarted or resumed in the future.
  • D. achievedColdShutdown
    Indicates that a system, typically a nuclear reactor, has been brought to and maintained in a safe, fully shut down state with core temperatures low enough to prevent further fission or damage.
  • E. firstLongShutdown
    Indicates the first occurrence of a prolonged shutdown event affecting the referenced entity or system.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3494af2808190ad98cec2f1bc0fe6 completed April 30, 2026, 12:21 p.m.
NER Named-entity recognition batch_69f6d17a0d88819082ad29b5ec8b2aec completed May 3, 2026, 4:39 a.m.
PD Predicate disambiguation batch_69f6cfe5f93c8190995c53dbbe380a32 completed May 3, 2026, 4:32 a.m.
Created at: May 1, 2026, 1:21 a.m.