Triple

T32958441
Position Surface form Disambiguated ID Type / Status
Subject Renewables Obligation (historical) E843168 entity
Predicate instanceOf P0 FINISHED
Object renewable energy support scheme C59621 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: renewable energy support scheme
Context triple: [Renewables Obligation (historical), instanceOf, renewable energy support scheme]
  • A. renewable energy support mechanism chosen
    A renewable energy support mechanism is a policy or financial instrument designed to encourage the development, deployment, and integration of renewable energy sources by improving their economic viability and market competitiveness.
  • B. energy bill rebate scheme
    An energy bill rebate scheme is a program that provides households or businesses with partial refunds or credits on their energy costs to reduce financial burden and encourage affordable energy use.
  • C. renewable energy technology project
    A renewable energy technology project is an organized initiative that designs, develops, and implements systems or solutions to generate energy from naturally replenishing sources such as solar, wind, hydro, or geothermal power.
  • D. renewable energy power station
    A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
  • E. renewable portfolio standard
    A renewable portfolio standard is a regulatory policy that requires electricity providers to obtain a specified minimum percentage of their power from renewable energy sources by certain target dates.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3494af2808190ad98cec2f1bc0fe6 completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:21 a.m.