Triple
T32958393
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Contracts for Difference scheme |
E843167
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | renewable energy support mechanism |
C59621
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: renewable energy support mechanism Context triple: [Contracts for Difference scheme, instanceOf, renewable energy support mechanism]
-
A.
renewable energy power station
A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
-
B.
renewable portfolio standard
A renewable portfolio standard is a regulatory policy that requires electricity providers to obtain a specified minimum percentage of their power from renewable energy sources by certain target dates.
-
C.
renewable energy technology project
A renewable energy technology project is an organized initiative that designs, develops, and implements systems or solutions to generate energy from naturally replenishing sources such as solar, wind, hydro, or geothermal power.
-
D.
universal service support mechanism
A universal service support mechanism is a regulatory and financial framework designed to ensure that essential communication services are available, affordable, and accessible to all users, including those in high-cost or underserved areas.
-
E.
renewable energy project portfolio
A renewable energy project portfolio is a strategically managed collection of diverse clean energy initiatives (such as solar, wind, hydro, and storage projects) designed to achieve specific financial, environmental, and risk-management objectives.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3494af2808190ad98cec2f1bc0fe6 |
completed | April 30, 2026, 12:21 p.m. |
Created at: May 1, 2026, 1:21 a.m.