Triple

T32952867
Position Surface form Disambiguated ID Type / Status
Subject International Route 7 E843007 entity
Predicate instanceOf P0 FINISHED
Object trans-Andean road C22442 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: trans-Andean road
Context triple: [International Route 7, instanceOf, trans-Andean road]
  • A. trans-Andean railway
    A trans-Andean railway is a rail line that crosses the Andes Mountains, connecting regions or countries on either side of the range to facilitate transportation and trade.
  • B. Chilean road chosen
    A Chilean road is a transportation route within Chile’s national or regional network, designed for vehicular travel and identified by a specific classification and numbering system.
  • C. Mexican Federal Highway
    A Mexican Federal Highway is a nationally administered roadway forming part of Mexico’s primary highway network, designed to connect major cities, regions, and borders for long-distance vehicular travel.
  • D. Inca road system
    The Inca road system was an extensive, sophisticated network of paved and unpaved routes spanning thousands of kilometers across the Andes, designed to connect and administer the vast Inca Empire through efficient communication, trade, and military movement.
  • E. Colombian national highway
    A Colombian national highway is a major road within Colombia’s national road network that connects key cities, regions, and borders to support transportation, commerce, and mobility across the country.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3494a31f481909057136e49b4fe60 completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:21 a.m.