Triple

T32948495
Position Surface form Disambiguated ID Type / Status
Subject Hongqiao Road E842875 entity
Predicate instanceOf P0 FINISHED
Object Shanghai Metro interchange station C23508 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Shanghai Metro interchange station
Context triple: [Hongqiao Road, instanceOf, Shanghai Metro interchange station]
  • A. Shanghai Metro station chosen
    A Shanghai Metro station is a designated public transit facility within the Shanghai Metro network where passengers access, board, transfer between, and alight from metro trains.
  • B. railway–metro interchange
    A railway–metro interchange is a transport facility where mainline railway services and urban metro lines connect, enabling passengers to transfer conveniently between regional and local rail networks.
  • C. Taipei Metro station
    A Taipei Metro station is a designated facility within the Taipei rapid transit system where passengers access, board, transfer between, and alight from metro trains, typically featuring platforms, ticketing areas, and passenger amenities.
  • D. Shanghai Metro depot
    A Shanghai Metro depot is a specialized facility where metro trains are stored, inspected, maintained, and dispatched to support the operation of the Shanghai subway network.
  • E. group of metro interchange stations
    A group of metro interchange stations is a collection of transit hubs where multiple metro lines intersect, enabling passengers to transfer between routes within an urban rail network.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3494a31f481909057136e49b4fe60 completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:21 a.m.