Triple
T3292580
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | River Wensum |
E69134
|
entity |
| Predicate | hasManagementPlan |
P8851
|
FINISHED |
| Object |
River Wensum Restoration Strategy
The River Wensum Restoration Strategy is a conservation and management initiative aimed at restoring the ecological health, natural processes, and biodiversity of the River Wensum in Norfolk, England.
|
E345276
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: River Wensum Restoration Strategy | Statement: [River Wensum, hasManagementPlan, River Wensum Restoration Strategy]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: River Wensum Restoration Strategy Context triple: [River Wensum, hasManagementPlan, River Wensum Restoration Strategy]
-
A.
Muddy River Restoration Project
The Muddy River Restoration Project is an environmental and flood-control initiative focused on rehabilitating the Muddy River’s ecosystem, improving water quality, and reducing storm-related flooding in its surrounding urban areas.
-
B.
Thames Estuary 2100 flood management plan
The Thames Estuary 2100 flood management plan is a long-term UK strategy developed by the Environment Agency to manage tidal flood risk in the Thames Estuary through to the end of the century, accounting for climate change and sea-level rise.
-
C.
Adyar River Restoration Project
The Adyar River Restoration Project is an environmental initiative aimed at rehabilitating and rejuvenating the polluted Adyar River and its surrounding ecosystems in Chennai, India.
-
D.
Schuylkill River Restoration Fund
The Schuylkill River Restoration Fund is a grant program that supports projects aimed at improving water quality, habitat, and overall ecological health within the Schuylkill River watershed.
-
E.
Carson River Watershed Adaptive Stewardship Plan
The Carson River Watershed Adaptive Stewardship Plan is a comprehensive, long-term strategy guiding collaborative, science-based management and restoration of the Carson River watershed’s natural resources and water quality.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: River Wensum Restoration Strategy Triple: [River Wensum, hasManagementPlan, River Wensum Restoration Strategy]
Generated description
The River Wensum Restoration Strategy is a conservation and management initiative aimed at restoring the ecological health, natural processes, and biodiversity of the River Wensum in Norfolk, England.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: River Wensum Restoration Strategy Target entity description: The River Wensum Restoration Strategy is a conservation and management initiative aimed at restoring the ecological health, natural processes, and biodiversity of the River Wensum in Norfolk, England.
-
A.
Muddy River Restoration Project
The Muddy River Restoration Project is an environmental and flood-control initiative focused on rehabilitating the Muddy River’s ecosystem, improving water quality, and reducing storm-related flooding in its surrounding urban areas.
-
B.
Thames Estuary 2100 flood management plan
The Thames Estuary 2100 flood management plan is a long-term UK strategy developed by the Environment Agency to manage tidal flood risk in the Thames Estuary through to the end of the century, accounting for climate change and sea-level rise.
-
C.
Adyar River Restoration Project
The Adyar River Restoration Project is an environmental initiative aimed at rehabilitating and rejuvenating the polluted Adyar River and its surrounding ecosystems in Chennai, India.
-
D.
Schuylkill River Restoration Fund
The Schuylkill River Restoration Fund is a grant program that supports projects aimed at improving water quality, habitat, and overall ecological health within the Schuylkill River watershed.
-
E.
Carson River Watershed Adaptive Stewardship Plan
The Carson River Watershed Adaptive Stewardship Plan is a comprehensive, long-term strategy guiding collaborative, science-based management and restoration of the Carson River watershed’s natural resources and water quality.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad859d45748190b0742408c954b39f |
completed | March 8, 2026, 2:20 p.m. |
| NER | Named-entity recognition | batch_69adb07379dc8190b7bb409bcf42bdd6 |
completed | March 8, 2026, 5:22 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b2e86895988190a7acaa5948b50bcd |
completed | March 12, 2026, 4:23 p.m. |
| NEDg | Description generation | batch_69b2ec48bf888190a5eeac0aa2cc50c3 |
completed | March 12, 2026, 4:39 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69b2ecd134e88190933e52d7f1f5be2a |
completed | March 12, 2026, 4:41 p.m. |
Created at: March 8, 2026, 3:10 p.m.