Triple

T32925759
Position Surface form Disambiguated ID Type / Status
Subject Concourses A E842266 entity
Predicate partOfInfrastructureType P107675 FINISHED
Object airport terminal infrastructure LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: airport terminal infrastructure | Statement: [Concourses A, partOfInfrastructureType, airport terminal infrastructure]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: partOfInfrastructureType
Context triple: [Concourses A, partOfInfrastructureType, airport terminal infrastructure]
  • A. isPartOfInfrastructureType chosen
    Indicates that something belongs to, or is categorized under, a specific type of infrastructure.
  • B. isPartOfInfrastructure
    Indicates that something belongs to, is included within, or functions as a component of a larger infrastructure system.
  • C. typeOfTransportInfrastructure
    Indicates the specific category or kind of transport infrastructure associated with or used in a given context.
  • D. isTransportationInfrastructure
    Indicates that something functions as a physical facility or system designed to support the movement of people or goods, such as roads, railways, ports, or airports.
  • E. transportInfrastructureFeature
    Indicates a relationship where an entity is a specific element or component of transport infrastructure, such as roads, railways, or related facilities.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34948adfc8190a937f1f622783c0b completed April 30, 2026, 12:21 p.m.
NER Named-entity recognition batch_69ffc89596d08190b97bd60b45c7f9c0 completed May 9, 2026, 11:51 p.m.
PD Predicate disambiguation batch_69ffc81ba5dc8190ae94d44e2284948f completed May 9, 2026, 11:49 p.m.
Created at: May 1, 2026, 1:20 a.m.