Triple

T3291022
Position Surface form Disambiguated ID Type / Status
Subject London Millennium Pier E69100 entity
Predicate instanceOf P0 FINISHED
Object river transport pier C6403 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: river transport pier
Context triple: [London Millennium Pier, instanceOf, river transport pier]
  • A. waterfront pier complex
    A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
  • B. river ferry dock chosen
    A river ferry dock is a designated waterfront structure where ferries safely load, unload, and temporarily moor while transporting passengers, vehicles, or goods across a river.
  • C. ferry terminal
    A ferry terminal is a designated facility where passengers and vehicles embark and disembark from ferries, typically providing ticketing, waiting areas, and docking infrastructure.
  • D. inland port
    An inland port is a logistics and transportation hub located away from coastal seaports, typically along rivers, canals, or rail corridors, that facilitates the transfer, storage, and distribution of goods between different modes of transport.
  • E. port authority
    A port authority is an organization responsible for managing, regulating, and developing a seaport or group of ports, including their infrastructure, operations, and related maritime activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad859d45748190b0742408c954b39f completed March 8, 2026, 2:20 p.m.
Created at: March 8, 2026, 3:10 p.m.