Triple

T3285081
Position Surface form Disambiguated ID Type / Status
Subject The Winds of Winter E68960 entity
Predicate authorConfirmedCompletionStatus P7062 FINISHED
Object unfinished (as of 2024) LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: unfinished (as of 2024) | Statement: [The Winds of Winter, authorConfirmedCompletionStatus, unfinished (as of 2024)]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: authorConfirmedCompletionStatus
Context triple: [The Winds of Winter, authorConfirmedCompletionStatus, unfinished (as of 2024)]
  • A. confirmedBy
    Indicates that one entity validates, approves, or verifies the truth, accuracy, or occurrence of another entity or event.
  • B. authorshipStatus chosen
    Indicates the current state or condition of an entity’s role as an author in relation to a work (e.g., confirmed, disputed, anonymous, or pending).
  • C. achievementStatus
    Indicates the current state or level of completion of an achievement-related goal or milestone for an entity.
  • D. confirmationOutcome
    Indicates the result or status produced when a prior action, request, or assertion is checked and confirmed.
  • E. completedBy
    Indicates that a task, process, or action has been finished or carried out by a particular entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad859c463481909ca4be267336c290 completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adb0377c9c819089af47952946de52 completed March 8, 2026, 5:21 p.m.
PD Predicate disambiguation batch_69ada421fadc8190b7c7d3c8afd20061 completed March 8, 2026, 4:30 p.m.
Created at: March 8, 2026, 3:10 p.m.