Triple

T3284495
Position Surface form Disambiguated ID Type / Status
Subject The Winds of Winter E68947 entity
Predicate hasWorkingStatus P39444 FINISHED
Object in progress LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: in progress | Statement: [The Winds of Winter, hasWorkingStatus, in progress]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasWorkingStatus
Context triple: [The Winds of Winter, hasWorkingStatus, in progress]
  • A. worksStatus chosen
    Indicates the current state or condition of an entity’s work or project, such as whether it is planned, in progress, completed, or otherwise categorized.
  • B. hasWorkBy
    Indicates that one entity (such as a collection, exhibition, or publication) includes or contains creative works produced by another entity (such as an artist, author, or creator).
  • C. hasWorkingMode
    Indicates that an entity operates under or supports a particular mode or configuration of functioning.
  • D. hasActivityStatus
    Indicates the current state or condition of an activity, such as whether it is planned, ongoing, completed, or cancelled.
  • E. hasWorkCount
    Indicates the number of works (such as items, creations, or outputs) associated with a given entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad859c463481909ca4be267336c290 completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adb0377c9c819089af47952946de52 completed March 8, 2026, 5:21 p.m.
PD Predicate disambiguation batch_69ada421fadc8190b7c7d3c8afd20061 completed March 8, 2026, 4:30 p.m.
Created at: March 8, 2026, 3:10 p.m.