Triple

T32844090
Position Surface form Disambiguated ID Type / Status
Subject April Laws E840048 entity
Predicate enactedInMonth P1260 FINISHED
Object April 1848 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: April 1848 | Statement: [April Laws, enactedInMonth, April 1848]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: enactedInMonth
Context triple: [April Laws, enactedInMonth, April 1848]
  • A. enactedDuring
    Indicates that an action, event, or state occurred within the temporal span of a specified time period or event.
  • B. dateEnacted chosen
    Indicates the date on which a law, policy, or formal measure was officially put into effect or became legally operative.
  • C. announcedInMonth
    Indicates that an announcement or declaration occurred during a specified calendar month.
  • D. inaugurationMonth
    Indicates the calendar month in which an inauguration event for an entity takes place.
  • E. proposedInMonth
    Indicates that an entity (such as a proposal or plan) was formally proposed during a specific calendar month.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3493ff0888190b51e974eae2a7834 completed April 30, 2026, 12:21 p.m.
NER Named-entity recognition batch_69f6ce6d659881909ddcec1d2966e020 completed May 3, 2026, 4:26 a.m.
PD Predicate disambiguation batch_69f6cc1667a48190b42684f6ec22dae9 completed May 3, 2026, 4:16 a.m.
Created at: May 1, 2026, 1:16 a.m.