Triple

T32830134
Position Surface form Disambiguated ID Type / Status
Subject Miami and Erie Canal E839663 entity
Predicate instanceOf P0 FINISHED
Object 19th-century infrastructure project C20963 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 19th-century infrastructure project
Context triple: [Miami and Erie Canal, instanceOf, 19th-century infrastructure project]
  • A. 19th-century infrastructure chosen
    19th-century infrastructure encompasses the transportation, communication, and utility systems—such as railways, canals, telegraph networks, roads, and early urban services—built during the 1800s that enabled industrialization and expanded economic and social connectivity.
  • B. 19th-century architectural project
    A 19th-century architectural project is a planned building or complex designed and developed during the 1800s, reflecting the period’s characteristic styles, technologies, and cultural influences.
  • C. 19th-century bridge
    A 19th-century bridge is a transportation structure built during the 1800s that typically reflects the era’s industrial advances in materials and engineering, such as iron, steel, and improved masonry techniques.
  • D. infrastructure project
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • E. 19th-century industrial enterprise
    A 19th-century industrial enterprise is a large-scale, mechanized business organization that harnesses steam power, factory production, and wage labor to mass-produce goods within emerging capitalist markets.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3493f22f88190ae6dd4bc15b6cf8d completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:16 a.m.