Triple
T32827938
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Manaus 2014 FIFA World Cup matches |
E839603
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 2014 FIFA World Cup group-stage matches |
C56414
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 2014 FIFA World Cup group-stage matches Context triple: [Manaus 2014 FIFA World Cup matches, instanceOf, 2014 FIFA World Cup group-stage matches]
-
A.
2014 FIFA World Cup group stage match
chosen
A 2014 FIFA World Cup group stage match is an official tournament game played between two national teams during the initial round-robin phase, determining points and standings within their group.
-
B.
2018 FIFA World Cup group stage match
A 2018 FIFA World Cup group stage match is an official tournament game played between two national teams within a round-robin group, contributing points that determine which teams advance to the knockout stage.
-
C.
FIFA World Cup knockout stage match
A FIFA World Cup knockout stage match is a single-elimination football game between two national teams in the tournament’s post-group phase, where the loser is immediately eliminated and the winner advances to the next round or wins the title.
-
D.
FIFA World Cup semi-final
A FIFA World Cup semi-final is a high-stakes knockout match between two national teams that determines which one advances to the tournament’s final.
-
E.
FIFA World Cup qualification
FIFA World Cup qualification is the multi-stage, regional tournament process through which national football teams compete for limited spots to participate in the FIFA World Cup finals.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3493f22f88190ae6dd4bc15b6cf8d |
completed | April 30, 2026, 12:21 p.m. |
Created at: May 1, 2026, 1:16 a.m.