Triple

T32812732
Position Surface form Disambiguated ID Type / Status
Subject Central Puget Sound Regional Transit Authority District E839200 entity
Predicate instanceOf P0 FINISHED
Object special purpose taxing district C2259 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: special purpose taxing district
Context triple: [Central Puget Sound Regional Transit Authority District, instanceOf, special purpose taxing district]
  • A. special-purpose district chosen
    A special-purpose district is a limited-purpose local government entity created to perform a specific public function or set of functions—such as water supply, transportation, or education—within a defined geographic area.
  • B. special-purpose governmental unit
    A special-purpose governmental unit is a limited-scope public entity, such as a school district or water authority, created by law to perform a specific governmental function or set of functions within a defined geographic area.
  • C. special provision
    A special provision is a specific clause or condition within a legal or contractual document that creates an exception, modification, or additional requirement to the general rules or terms.
  • D. special economic zone
    A special economic zone is a designated geographic area within a country where business and trade laws differ from the rest of the nation to attract investment, boost exports, and stimulate economic growth.
  • E. local tax
    Local tax is a compulsory financial charge imposed by municipal or regional authorities on individuals, businesses, or property within their jurisdiction to fund local public services and infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3493d35208190b4351b4e85f2fa16 completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:15 a.m.