Triple

T32807660
Position Surface form Disambiguated ID Type / Status
Subject NVIDIA CUDA Programming Guide E839060 entity
Predicate instanceOf P0 FINISHED
Object programming guide C15482 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: programming guide
Context triple: [NVIDIA CUDA Programming Guide, instanceOf, programming guide]
  • A. software engineering guideline chosen
    A software engineering guideline is a documented recommendation or best practice that directs how software should be designed, developed, tested, and maintained to ensure quality, consistency, and efficiency.
  • B. coding tutorial format
    A coding tutorial format is a structured way of presenting programming concepts and exercises—often combining explanations, code examples, and step-by-step tasks—to guide learners from basic understanding to practical application.
  • C. writing guide
    A writing guide is a structured resource that provides principles, techniques, and examples to help individuals plan, compose, revise, and refine written work effectively.
  • D. web-based guidance
    Web-based guidance is an online, interactive support system that provides users with step-by-step instructions, recommendations, or decision assistance through a web interface.
  • E. program
    A program is a structured set of instructions written in a programming language that a computer can execute to perform specific tasks or solve problems.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3493d35208190b4351b4e85f2fa16 completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:15 a.m.