Triple
T32796271
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Shuto Expressway Route 7 Komatsugawa Line |
E838772
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Shuto Expressway route |
C25891
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Shuto Expressway route Context triple: [Shuto Expressway Route 7 Komatsugawa Line, instanceOf, Shuto Expressway route]
-
A.
400-series highway
A 400-series highway is a high-capacity, controlled-access freeway in Ontario, Canada, designed for rapid, long-distance vehicular travel with multiple lanes and limited entry and exit points.
-
B.
E-road
An E-road is a major international road within the trans-European E-road network, designated by an "E" followed by a number, that facilitates cross-border road transport across multiple European countries.
-
C.
elevated expressway
chosen
An elevated expressway is a high-capacity roadway built on raised structures above ground level to allow uninterrupted traffic flow over urban streets, railways, or other obstacles.
-
D.
highway route
A highway route is a designated path along interconnected roads or highways, identified by a specific number or name, that guides long-distance vehicular travel between regions or destinations.
-
E.
Mexican Federal Highway
A Mexican Federal Highway is a nationally administered roadway forming part of Mexico’s primary highway network, designed to connect major cities, regions, and borders for long-distance vehicular travel.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3493c7f6881908edf2aa13631d1e0 |
completed | April 30, 2026, 12:21 p.m. |
Created at: May 1, 2026, 1:14 a.m.