Triple
T32779720
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dniester River (bridges and infrastructure) |
E838319
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | cross-border infrastructure system |
C47990
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: cross-border infrastructure system Context triple: [Dniester River (bridges and infrastructure), instanceOf, cross-border infrastructure system]
-
A.
cross-border energy infrastructure project
A cross-border energy infrastructure project is a coordinated initiative to plan, finance, build, and operate energy facilities—such as pipelines, transmission lines, or interconnectors—that physically link and serve multiple countries’ energy systems.
-
B.
cross-border transport link
A cross-border transport link is an infrastructure connection—such as a road, railway, bridge, tunnel, or ferry route—that enables the movement of people and goods between two or more countries.
-
C.
cross-border institution
A cross-border institution is an organization or entity that operates across national boundaries, coordinating policies, activities, or services between multiple countries or jurisdictions.
-
D.
international border system
chosen
An international border system is the coordinated set of legal frameworks, physical infrastructures, technologies, and administrative processes that regulate the movement of people, goods, and information between sovereign states.
-
E.
cross-Channel transport infrastructure
Cross-Channel transport infrastructure encompasses the physical and operational systems—such as tunnels, ports, terminals, and associated logistics facilities—that enable the movement of people and goods between the UK and mainland Europe across the English Channel.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3493b83f48190be335cd42465cecf |
completed | April 30, 2026, 12:21 p.m. |
Created at: May 1, 2026, 1:14 a.m.