Triple

T32779316
Position Surface form Disambiguated ID Type / Status
Subject University of Iowa Cambus E838306 entity
Predicate instanceOf P0 FINISHED
Object university shuttle system C911 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: university shuttle system
Context triple: [University of Iowa Cambus, instanceOf, university shuttle system]
  • A. public transit system chosen
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • B. university system
    A university system is an integrated organizational framework that manages academic programs, students, faculty, resources, and administrative processes across one or more higher education institutions.
  • C. campus axis
    A campus axis is a primary organizing line or pathway that structures the spatial layout, circulation, and visual relationships of buildings and open spaces across a campus.
  • D. university satellite campus
    A university satellite campus is a geographically separate branch of a main university that offers selected academic programs and services to extend access to higher education in a different location.
  • E. streetcar system
    A streetcar system is an urban public transit network that operates rail vehicles on fixed tracks, typically embedded in city streets, to transport passengers along defined routes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3493a824c8190938489ba69041d08 completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:13 a.m.