Triple
T32717065
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Corps des ponts et chaussées |
E836548
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | French technical civil service corps |
C49097
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: French technical civil service corps Context triple: [Corps des ponts et chaussées, instanceOf, French technical civil service corps]
-
A.
French military engineering service
The French military engineering service is the branch of the armed forces responsible for designing, constructing, maintaining, and protecting military infrastructure, fortifications, and field works to support national defense and operational capabilities.
-
B.
French military personnel
Individuals who serve or have served in the armed forces of France, including the Army, Navy, Air and Space Force, National Gendarmerie, and related military branches.
-
C.
French military school
A French military school is an educational institution in France that combines academic instruction with military training to prepare students for service as officers or specialized personnel in the armed forces.
-
D.
civil service corps
chosen
A civil service corps is a body of government employees selected and employed under formal rules and merit-based systems to administer public policies and deliver state services.
-
E.
French military mission
A French military mission is an official deployment of French armed forces personnel abroad to provide training, advisory support, operational assistance, or security cooperation to a partner nation or international organization.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34935455881909088975d79460418 |
completed | April 30, 2026, 12:21 p.m. |
Created at: May 1, 2026, 1:11 a.m.