Triple

T32715452
Position Surface form Disambiguated ID Type / Status
Subject CCR Ponte E836509 entity
Predicate operatedRoadMaintenance P5944 FINISHED
Object Rio–Niterói Bridge NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Rio–Niterói Bridge | Statement: [CCR Ponte, operatedRoadMaintenance, Rio–Niterói Bridge]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: operatedRoadMaintenance
Context triple: [CCR Ponte, operatedRoadMaintenance, Rio–Niterói Bridge]
  • A. roadOperator chosen
    Indicates that one entity is responsible for operating, managing, or maintaining a particular road or road network.
  • B. hasRoadEngineeringWorks
    Indicates that road-related construction, maintenance, or engineering activities are being carried out on or associated with a given road or location.
  • C. mainRoadInfrastructure
    Indicates that a road segment functions as a primary or major route within the transportation infrastructure network.
  • D. typeOfRoadOperated
    Indicates that an entity operates or manages a specific type or category of road.
  • E. roadConstruction
    Indicates that construction work is being carried out on a road, typically involving building, repairing, or modifying the roadway infrastructure.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34935455881909088975d79460418 completed April 30, 2026, 12:21 p.m.
NER Named-entity recognition batch_6a00233e2170819084bee0c8f74cc1a4 completed May 10, 2026, 6:18 a.m.
PD Predicate disambiguation batch_6a0022943fd08190b73007f080d5971d completed May 10, 2026, 6:15 a.m.
Created at: May 1, 2026, 1:11 a.m.