Triple

T32715451
Position Surface form Disambiguated ID Type / Status
Subject CCR Ponte E836509 entity
Predicate operatedTrafficManagement P188451 FINISHED
Object Rio–Niterói Bridge NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Rio–Niterói Bridge | Statement: [CCR Ponte, operatedTrafficManagement, Rio–Niterói Bridge]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: operatedTrafficManagement
Context triple: [CCR Ponte, operatedTrafficManagement, Rio–Niterói Bridge]
  • A. managesTrafficFor chosen
    Indicates that one entity is responsible for directing, controlling, or regulating the flow of traffic for another entity or area.
  • B. hasTrafficManagement
    Indicates that an entity implements, uses, or is associated with systems or measures for controlling and optimizing traffic flow.
  • C. regulatesTrafficBetween
    Indicates that one entity controls, manages, or directs the flow of traffic occurring between two other entities or locations.
  • D. trafficManagementStrategy
    Indicates a method or plan used to control, organize, or optimize the flow of traffic within a transportation system.
  • E. managesWaterwayTraffic
    Indicates that an entity is responsible for directing, regulating, or overseeing the movement of vessels and other traffic along a waterway.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34935455881909088975d79460418 completed April 30, 2026, 12:21 p.m.
NER Named-entity recognition batch_6a002249ee388190a9501ee7630dc658 completed May 10, 2026, 6:14 a.m.
PD Predicate disambiguation batch_6a002189273881909b6b687e2d61f5b1 completed May 10, 2026, 6:11 a.m.
Created at: May 1, 2026, 1:11 a.m.