Triple

T32708806
Position Surface form Disambiguated ID Type / Status
Subject JSR 352 E836343 entity
Predicate instanceOf P0 FINISHED
Object Java Specification Request C41752 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Java Specification Request
Context triple: [JSR 352, instanceOf, Java Specification Request]
  • A. JSR chosen
    JSR is a conceptual class representing a standardized Java Specification Request that defines proposed enhancements or additions to the Java platform.
  • B. requirements definition tool
    A requirements definition tool is a software application that helps stakeholders capture, organize, analyze, and manage system or project requirements throughout the development lifecycle.
  • C. Java platform edition
    Java platform edition is a specific configuration of the Java platform (such as SE, EE, or ME) that defines a standardized set of APIs, libraries, and runtime capabilities tailored for a particular category of applications and deployment environments.
  • D. requirements management tool
    A requirements management tool is a software application that helps capture, organize, trace, prioritize, and track changes to system or project requirements throughout the development lifecycle.
  • E. Oracle specification
    An Oracle specification is a formal description of the expected behavior and outcomes of a system or component, used as a reference to determine whether its actual outputs are correct.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3493446148190819541f3ffe79975 completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:10 a.m.