Triple

T32708083
Position Surface form Disambiguated ID Type / Status
Subject Jakarta CDI E836327 entity
Predicate instanceOf P0 FINISHED
Object dependency injection framework C34918 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: dependency injection framework
Context triple: [Jakarta CDI, instanceOf, dependency injection framework]
  • A. coordination framework
    A coordination framework is a structured set of principles, processes, and tools that enables multiple actors or components to align, communicate, and work together effectively toward shared goals.
  • B. programming framework chosen
    A programming framework is a reusable, structured foundation of prewritten code, tools, and conventions that simplifies and standardizes the development of software applications.
  • C. engineering framework
    An engineering framework is a structured set of principles, methods, and tools that guides the systematic design, development, and evaluation of engineering solutions.
  • D. object-oriented framework
    An object-oriented framework is a reusable, extensible software structure that defines cooperating classes and interfaces to provide a common architecture for building applications in a specific domain.
  • E. public institution framework
    A public institution framework is a structured model that defines the principles, governance, processes, and accountability mechanisms guiding how public organizations operate and deliver services to society.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3493446148190819541f3ffe79975 completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:10 a.m.