Triple

T3270338
Position Surface form Disambiguated ID Type / Status
Subject A74 road E68630 entity
Predicate upgradeRoute P17584 FINISHED
Object M74 motorway E10392 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M74 motorway | Statement: [A74 road, upgradeRoute, M74 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M74 motorway
Context triple: [A74 road, upgradeRoute, M74 motorway]
  • A. M74 motorway chosen
    The M74 motorway is a major Scottish motorway forming a key part of the route between Glasgow and the English border, carrying long-distance traffic towards the M6.
  • B. M4 motorway
    The M4 motorway is a major west–east route in the United Kingdom linking London with South Wales via key cities such as Reading, Swindon, Bristol and Newport.
  • C. M6 motorway
    The M6 motorway is a major north–south route in England, running from the Midlands to the Scottish border and serving as a key part of the UK’s strategic road network.
  • D. M54 motorway
    The M54 motorway is a key road in the West Midlands of England that links the M6 near Wolverhampton to Telford and provides an important route toward Shropshire and mid-Wales.
  • E. M3 motorway
    The M3 motorway is a major road in southern England that connects London to Southampton, passing through counties including Surrey and Hampshire.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: upgradeRoute
Context triple: [A74 road, upgradeRoute, M74 motorway]
  • A. upgradePath chosen
    Indicates the relationship by which one entity can be improved, enhanced, or transitioned into another, typically more advanced, version or state.
  • B. upgradeType
    Indicates the specific kind or category of improvement or enhancement applied to an entity relative to its previous state.
  • C. upgradeGoal
    Indicates that an entity has a target or intended improvement to a higher level, version, or state relative to its current condition.
  • D. upgradeProgram
    Indicates that one entity improves, enhances, or replaces another entity’s program with a more advanced or updated version.
  • E. upgradeStatus
    Indicates the current state or progress of an upgrade process applied to an entity.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad859b54f881909bf530d549caf2fd completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adaff349148190beae8c0994b7ad83 completed March 8, 2026, 5:20 p.m.
NED1 Entity disambiguation (via context triple) batch_69c83414c374819085ca1e441728c6af completed March 28, 2026, 8:03 p.m.
PD Predicate disambiguation batch_69ada41d7eac8190ada4bf5f793d5c49 completed March 8, 2026, 4:30 p.m.
Created at: March 8, 2026, 3:09 p.m.