Triple
T32703333
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | BAC 3-11 |
E836202
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | proposed jet airliner |
C61630
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: proposed jet airliner Context triple: [BAC 3-11, instanceOf, proposed jet airliner]
-
A.
proposed airliner
chosen
A proposed airliner is a conceptual design for a future commercial passenger aircraft that outlines intended performance, capacity, technology, and operational roles but has not yet been built or certified.
-
B.
jet airliner
A jet airliner is a large, powered aircraft designed to transport passengers and cargo over medium to long distances using jet engines for high-speed, high-altitude flight.
-
C.
pressurized airliner
A pressurized airliner is a commercial aircraft designed with a sealed, reinforced fuselage and environmental control systems to maintain safe, comfortable cabin pressure and air quality at high altitudes.
-
D.
business jet
A business jet is a small, fast, and typically luxurious aircraft designed to transport a limited number of passengers, usually corporate or high-net-worth individuals, on private or chartered flights.
-
E.
jet-powered aircraft
A jet-powered aircraft is a fixed-wing or VTOL vehicle that generates thrust primarily from one or more jet engines to achieve and sustain flight.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3493323288190a4e88251035fe96e |
completed | April 30, 2026, 12:21 p.m. |
Created at: May 1, 2026, 1:10 a.m.