Triple

T3270304
Position Surface form Disambiguated ID Type / Status
Subject Lake Oroville E68629 entity
Predicate createdByProject P806 FINISHED
Object Oroville Dam Project E68419 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Oroville Dam Project | Statement: [Lake Oroville, createdByProject, Oroville Dam Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Oroville Dam Project
Context triple: [Lake Oroville, createdByProject, Oroville Dam Project]
  • A. Oroville Dam chosen
    Oroville Dam is a large earthfill embankment dam on the Feather River in Northern California, serving as a key water storage, flood control, and hydroelectric facility.
  • B. Truckee-Carson Project
    The Truckee-Carson Project is a major U.S. federal water management and irrigation initiative in western Nevada that diverts and distributes water from the Truckee and Carson rivers to support agriculture and regional development.
  • C. Klamath Project
    The Klamath Project is a major federal water management and irrigation system in southern Oregon and northern California that supplies water to agriculture, wildlife refuges, and communities in the Klamath Basin.
  • D. Columbia Basin Project
    The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
  • E. Yakima Project
    The Yakima Project is a major federal water management and irrigation system in central Washington State that supplies water for agriculture, municipalities, and fish and wildlife habitat.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: createdByProject
Context triple: [Lake Oroville, createdByProject, Oroville Dam Project]
  • A. createdBy chosen
    Indicates that something was brought into existence, produced, or authored through the actions or efforts of a specific agent or entity.
  • B. parentProject
    Indicates that one project serves as the direct higher-level or containing project in relation to another project.
  • C. createdWork
    Indicates that an agent is responsible for bringing a work (such as a creative, intellectual, or produced artifact) into existence.
  • D. createdStatus
    Indicates that an entity has been newly created and is in its initial or just-established state within a system or process.
  • E. affectedByProject
    Indicates that an entity experiences an impact, change, or influence as a result of a specific project.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad859b54f881909bf530d549caf2fd completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adaff349148190beae8c0994b7ad83 completed March 8, 2026, 5:20 p.m.
NED1 Entity disambiguation (via context triple) batch_69b2e83e11f081909d64287c0902124a completed March 12, 2026, 4:22 p.m.
PD Predicate disambiguation batch_69ada41d7eac8190ada4bf5f793d5c49 completed March 8, 2026, 4:30 p.m.
Created at: March 8, 2026, 3:09 p.m.