Triple

T32683024
Position Surface form Disambiguated ID Type / Status
Subject Chang’e 6 E835638 entity
Predicate instanceOf P0 FINISHED
Object Chinese lunar mission C33146 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Chinese lunar mission
Context triple: [Chang’e 6, instanceOf, Chinese lunar mission]
  • A. Chinese space program asset
    A Chinese space program asset is any spacecraft, satellite, launch vehicle, ground facility, or related infrastructure owned, operated, or controlled by China to support its civil, military, or commercial space activities.
  • B. lunar sample-return mission chosen
    A lunar sample-return mission is a spaceflight endeavor designed to land on the Moon, collect geological material, and transport it safely back to Earth for detailed scientific analysis.
  • C. lunar landing mission
    A lunar landing mission is a coordinated spaceflight operation designed to transport a spacecraft from Earth to the Moon, achieve a controlled descent and landing on the lunar surface, conduct scientific or exploratory activities, and safely return data and/or crew.
  • D. NASA lunar impactor mission
    A NASA lunar impactor mission is a spaceflight project in which a spacecraft is deliberately crashed into the Moon’s surface to study its composition, structure, and environment through impact-generated data.
  • E. lunar exploration program
    A lunar exploration program is an organized, long-term initiative that plans, funds, and conducts missions to study, visit, and potentially utilize the Moon’s environment and resources.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3493211388190993801216afbc2a7 completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:09 a.m.