Triple
T32682126
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | South Massif |
E835614
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | lunar mountain |
C12603
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: lunar mountain Context triple: [South Massif, instanceOf, lunar mountain]
-
A.
lunar surface feature
chosen
A lunar surface feature is any distinct physical formation or characteristic on the Moon’s exterior, such as craters, maria, mountains, rilles, or valleys, identifiable by its shape, size, and location.
-
B.
Martian hill
A Martian hill is a naturally elevated landform on the surface of Mars, typically smaller than a mountain, shaped by volcanic, impact, and erosional processes unique to the Martian environment.
-
C.
lunar mansion
A lunar mansion is one of a series of divisions of the sky along the Moon’s apparent path, used in various astrological and calendrical systems to mark lunar positions and influences.
-
D.
cosmic mountain
A cosmic mountain is a mythic or symbolic peak that connects the earthly realm with the heavens or divine dimensions, serving as an axis mundi and site of creation, revelation, or transcendence.
-
E.
moon of Mars
A moon of Mars is a natural satellite that orbits the planet Mars, such as Phobos or Deimos, influencing its gravitational environment and surface phenomena.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3493211388190993801216afbc2a7 |
completed | April 30, 2026, 12:21 p.m. |
Created at: May 1, 2026, 1:09 a.m.