Triple

T32655519
Position Surface form Disambiguated ID Type / Status
Subject 2014 Paris Motor Show E834850 entity
Predicate openingDateForPress P137656 FINISHED
Object 2014-10-02 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2014-10-02 | Statement: [2014 Paris Motor Show, openingDateForPress, 2014-10-02]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: openingDateForPress
Context triple: [2014 Paris Motor Show, openingDateForPress, 2014-10-02]
  • A. openingPressDaysEnd chosen
    Indicates the point in time when the designated opening press days period concludes.
  • B. officialOpeningDate
    Indicates the calendar date on which something is formally inaugurated or officially opened for use or operation.
  • C. openingDateLine14
    Indicates the date on which something (such as a service, facility, or record) is opened or begins operation, as specified in line 14 of a form or document.
  • D. openingDateLine16
    Indicates the date on which line 16 was officially opened or began operation.
  • E. plannedOpeningDate
    Indicates the date on which something is scheduled or intended to begin operating or become available.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3492f72248190ba42fa596aea50e1 completed April 30, 2026, 12:21 p.m.
NER Named-entity recognition batch_69f7a225a77c81908f8953ccfeb14336 completed May 3, 2026, 7:29 p.m.
PD Predicate disambiguation batch_69f7a06d4f108190bae3ab9ae431d2c7 completed May 3, 2026, 7:22 p.m.
Created at: May 1, 2026, 1:08 a.m.