Triple

T32618834
Position Surface form Disambiguated ID Type / Status
Subject Village Stability Operations E833865 entity
Predicate instanceOf P0 FINISHED
Object stability operations concept C627 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: stability operations concept
Context triple: [Village Stability Operations, instanceOf, stability operations concept]
  • A. operational concept chosen
    An operational concept is a high-level description of how a system, organization, or capability is intended to function in practice to achieve its objectives within a specific context.
  • B. military operations center
    A military operations center is a centralized facility where commanders and staff monitor, coordinate, and direct military activities and resources in real time.
  • C. specialized operations division
    A specialized operations division is a focused organizational unit responsible for planning and executing complex, high-priority, or technically advanced missions that fall outside the scope of standard operational teams.
  • D. military operational command
    A military operational command is an organizational entity responsible for planning, directing, coordinating, and controlling military forces and resources to achieve specific operational objectives within a defined area or mission scope.
  • E. military operation
    A military operation is a coordinated and planned set of actions conducted by armed forces to achieve specific strategic, operational, or tactical objectives.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3492ccc80819086ef7d26e9786647 completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:06 a.m.