Triple
T32611359
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Viva Silver corridor |
E833660
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planned transit project |
C60730
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planned transit project Context triple: [Viva Silver corridor, instanceOf, planned transit project]
-
A.
planned transit corridor
A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
-
B.
planned public transit line
A planned public transit line is a proposed, not-yet-built transportation route with defined stops, alignment, and service characteristics intended for future public operation.
-
C.
commuter rail project
A commuter rail project is a coordinated planning, design, and construction effort to develop or improve rail services that transport passengers between suburbs or outlying regions and a central urban area, typically focused on reducing congestion and improving regional mobility.
-
D.
rapid transit expansion project
A rapid transit expansion project is a coordinated planning, design, and construction effort to extend or enhance high-capacity public transportation networks to improve urban mobility and accommodate future demand.
-
E.
planned metro station
A planned metro station is a proposed but not yet constructed or operational transit facility intended to serve as a future stop within an urban rail or subway network.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3492bfa648190b6ae472074634e29 |
completed | April 30, 2026, 12:21 p.m. |
Created at: May 1, 2026, 1:06 a.m.