Triple
T32586852
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Scottish railway works network |
E832944
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | industrial network |
C61360
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: industrial network Context triple: [Scottish railway works network, instanceOf, industrial network]
-
A.
manufacturing network
A manufacturing network is an interconnected system of facilities, suppliers, technologies, and logistics that collaboratively plan, produce, and distribute goods across multiple locations.
-
B.
industrial controller
An industrial controller is a specialized electronic device that monitors and regulates machinery and processes in industrial environments to maintain desired operating conditions safely and efficiently.
-
C.
industrial system
An industrial system is an integrated network of machines, processes, people, and control mechanisms designed to transform raw materials and energy into goods or services efficiently and reliably.
-
D.
industrial technology
Industrial technology is the practical application of engineering and manufacturing processes, tools, and systems to efficiently produce goods and improve industrial operations.
-
E.
network of industrialists
A network of industrialists is an interconnected group of business leaders and owners in industrial sectors who collaborate, share resources, and influence economic and policy decisions.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34929ff648190aded9424aa7564ae |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 1:04 a.m.